Jump to content

Ollelel

Pre Member
  • Content Count

    1
  • Joined

  • Last visited

  • Medals

Everything posted by Ollelel

  1. The most easiest way to do it is to link a side cost module to the zeus. Then just overprice the sides that you dont want to add to the zeus.
×