platypus257 10 Posted November 12, 2015 Hello I already searched the forms but i couldnt find anything related to it. So my problem is that when i create 2 separate tasks and assign both to the same group only one of them will be there, but i already tried and both of them will be assigned if one of the other isnt, I even tried assigning the task later in the game but that would't work either. So I was wondering if something isn't working or if I'm doing something wrong. Thanks in advance.:) Share this post Link to post Share on other sites